Kowloon Bay section opens on December 6
SingTao · 1 SOURCESabout 8 hours ago4 MIN

Summary
The Kowloon Bay section of the Central Kowloon Route will open on December 6, marking the full commissioning of Hong Kong’s 12.5-kilometre Route 6 east-west corridor. Peak-hour driving time between Yau Ma Tei and Tseung Kwan O town centre is expected to drop from about 65 minutes before the project to 12 minutes after full opening.
Key Points
- Leung Chung-lap (梁中立), head of the East Development Office of the Civil Engineering and Development Department, said the final Kowloon Bay section will complete Route 6 on December 6.
- Route 6 consists of the Tseung Kwan O-Lam Tin Tunnel, the Yau Ma Tei section of the Central Kowloon Route, and the soon-to-open Kowloon Bay section.
- Before Route 6, drivers between Tseung Kwan O and West Kowloon typically used Tseung Kwan O Tunnel, Kwun Tong Bypass, Kai Tak Tunnel and Gascoigne Road Flyover.
- Officials estimate the Central Kowloon Route can divert about 20% of east-west traffic in Kowloon and ease congestion on Kwun Tong Bypass, Lung Cheung Road and Kwun Tong Road.
- A flat HK$8 toll will apply for each trip after full opening, while three bus routes will be arranged to use the full Route 6 corridor.
Why It Matters
The new corridor is intended to separate longer cross-district traffic from shorter local trips, freeing capacity on existing urban roads and shortening commutes for residents in Tseung Kwan O, Kwun Tong, Wong Tai Sin and Kowloon City. It also strengthens road links to West Kowloon, Kai Tak, Kowloon East’s core business area and Tseung Kwan O Industrial Estate-related innovation activities through the Tseung Kwan O Cross Bay Link connection.