Fire probe points to welding or smoking at I.PARK1
HK01 · 7 SOURCESabout 5 hours ago2 MIN

Summary
The Fire Services Department has finished investigating the Grade 3 fire that broke out on 26 October at the Integrated Waste Management Facilities Phase 1, or I.PARK1, on an artificial island near Shek Kwu Chau. Investigators said the blaze may have been linked to welding works or smoking, while ruling out electrical failure, deliberate arson and spontaneous combustion of chemicals.
Key Points
- The fire started at a high-level area of the third incineration module inside the I.PARK1 incinerator building, according to the completed investigation.
- Fire investigators carried out evidence collection at the scene and took statements from relevant people before finalising the report and passing it to the Environmental Protection Department for follow-up.
- The blaze broke out at about 12:40pm on 26 October and was upgraded to a Grade 3 fire at 1:24pm as firefighters deployed more hoses and breathing apparatus teams
- The fire was put out after nearly four hours; Sing Tao reported that about 1,000 workers were evacuated by boat and a 60-year-old male staff member was airlifted to hospital after feeling unwell while helping firefighting efforts
- The Environmental Protection Department earlier said preliminary information suggested the rooftop fire in the third module was linked to finishing works and construction materials, not incineration operations or stored waste.
Why It Matters
The findings narrow the focus of follow-up action to site safety and work practices during finishing works at a major waste facility that had been in operation for less than a year. The case also matters because I.PARK1 had temporarily stopped receiving waste after the fire, while the first and second modules gradually resumed trial operations from 30 October