transport · On.cc

Route 6 to open fully on December 6

1 day ago2 MIN
Route 6 to open fully on December 6

Summary

Hong Kong’s Route 6 will become fully operational on December 6, when the Kowloon Bay section of the Central Kowloon Route opens and completes the east-west corridor linking West Kowloon and Tseung Kwan O. The Transport Department said the route has been equipped with multiple tunnel traffic management facilities, while the operator has hired more staff, tested equipment and run emergency drills ahead of the launch.

Key Points

  • The full Route 6 comprises three road tunnels: the Yau Ma Tei section of the Central Kowloon Route, the Kowloon Bay section of the Central Kowloon Route, and the Tseung Kwan O-Lam Tin Tunnel
  • The department said journeys between Tseung Kwan O and Yau Ma Tei will be shortened to about 12 minutes after the entire route opens on December 6
  • The entire corridor uses a Traffic Control and Surveillance System combining CCTV, automatic incident detectors, lane control signals, and variable speed and message signs for 24-hour monitoring.
  • Two traffic control centres at Kai Tak and Cha Kwo Ling will operate simultaneously, monitoring the Yau Ma Tei section, and the Kowloon Bay section together with the Tseung Kwan O-Lam Tin Tunnel.
  • The Transport Department said it worked with the Civil Engineering and Development Department on rigorous testing and drew up as many as 165 traffic contingency plans covering the whole route.

Why It Matters

For drivers using the new cross-Kowloon link, the main practical issue is whether incidents can be handled quickly enough to keep traffic moving through three connected tunnels. The department’s emphasis on unified operations, live monitoring and pre-set contingency plans points to a launch focused on reducing disruption once the final section opens.

READ IT IN THE APP

Download on the App Store